Progress Outside

After working at the Centre from 9-4, I came home to attack the roof. I got the roof sides lengthened and the drain pipe draining into the gutter. Then I got the shelf finished and loaded up my wood on it. I added supports so it should hold a lot.of.weight now. I also got a tile cutter that will cut the tiles we will use for our driveway. It scratches the tile and splits it. Our tile is textured, buy it works fine, and the cutter only cost about 12 bucks. Way better than cutting them with a saw!